Design the charging loop around shift change
The reliable moment to charge a terminal is the handover. Build the routine around it: the outgoing operator places the terminal on charge, the incoming operator takes a charged unit and a spare pack, and the handover log records the terminal number. This keeps availability predictable without asking anyone to remember a charging schedule mid-shift.
Place charging points where the handover happens — the guard room, the department back office, the production cart — rather than in a single central store that nobody visits during a shift.
Replaceable packs and Type-C charging
A replaceable lithium battery turns a charging delay into a pack swap of a few seconds. Keep at least one spare per terminal for teams that run more than eight hours, and label packs so a faulty unit can be traced. Type-C charging uses the same cable as most site equipment, which reduces the number of chargers that need to be carried and replaced.
Avoid charging in enclosed metal cabinets or on soft surfaces that trap heat. A ventilated shelf at room temperature is the simplest safe arrangement.
Storage between projects
For equipment that is stored between events, charge packs to roughly half capacity and keep them in a dry, cool place. Recharge every few months. Before a project, run a full charge cycle and check each pack against a known terminal so a weak pack is found before it reaches the site.
- Charge at shift handover, not on a separate schedule.
- Keep one labelled spare pack per terminal for long shifts.
- Store packs at partial charge in a dry, ventilated place.
- Test packs before a project rather than on site.
