A plant inspection team confirmed readings with the control room from inside obstructed corridors.

18 Terminals · 3 Groups · 1 GatewayProcess plant with elevated pipe corridors and a central control room

Project background

Sub-1G propagation suited the metal-heavy corridor environment. Inspection, maintenance and control room staff were placed on three groups, and the gateway connected to the control room network over Ethernet for a permanent dispatch position.

Metal structures and long pipe corridors attenuate radio signals, and mobile coverage inside the plant is inconsistent. Inspectors reading gauges in the corridor need to confirm values with the control room while they are still at the measurement point, not after walking back to an open area.

Deployment approach

The gateway was installed in the control room equipment rack and connected to the plant network over Ethernet, which gave the control room a permanent dispatch position instead of a handset passed between operators.

Eighteen terminals were assigned to three groups: inspection rounds, maintenance and control room. Inspection readings are confirmed within the inspection group, while maintenance coordination and control room instructions stay on their own groups.

Terminals carry replaceable batteries and charge over Type-C in the shift room. Inspection rounds were planned around two battery packs per terminal so a full shift and an overtime handover are both covered.

System specification

Published values from the KingNeed technical datasheet, paired with how they are applied in this deployment.

Download datasheet

32

Terminal capacity

18 in use

4

Independent groups

3 in use

8

Full-duplex users

per group

Sub-1G

Private network

local deployment

Voice mode
Full-duplex voice, 8 users per group across 3 active groups
Audio processing
Microphone and speaker at the control room desk
Headset / audio interface
Handheld terminals in the corridor; control room uses the gateway audio ports
Security
PUF hardware authentication for terminals on the plant network
Power
Gateway on rack DC supply; two battery packs per terminal

Network configuration

Terminals
18 handheld terminals
Independent groups
3 (inspection / maintenance / control room)
Gateway
1 cluster gateway in the control room rack
Network
Sub-1G private network, Ethernet link to the plant network
Accessories
Microphone and speaker at the control room desk, two battery packs per terminal

Deployment outcome

  • Readings are confirmed with the control room while the inspector is still at the measurement point.
  • Voice contact holds along pipe corridors where mobile coverage is inconsistent.
  • Control room, inspection and maintenance traffic stay on separate groups.

Start your project